T E K A M E C

Loading

CONSTELLATION 2 TOTAL

Clients

CONSTELLATION 2 TOTAL JACK-UP OFFSHORE ES WORKS / Gabon

Services

Construction

Decision of the solid control equipments to be installed with respect to API Spec2 and API 610.

´Desing of their orientation accordingly and place them on the related location in the drawing.
´Preparation of the flow diagram of the mud on the ES stuff.
´Mobilization of the equipments on the platform.
´Installationof decanding centrifuges, vert-G, vacuum cleaners, shale shakers, desanders and desilters for the water treatment &waste management.
´Design of the augers between the interface equipments if necessary,
´Commission them and adjust the feed rates.
´Operation services during casing stages.
´Decommission them after operation completed.
´Demobilization of all stuff.